  {"id":70585,"date":"2002-07-12T00:00:00","date_gmt":"2002-07-12T00:00:00","guid":{"rendered":"https:\/\/www.uri.edu\/news-draft\/uncategorized\/work-progresses-on-uris-10-6-million-ballentine-hall-additionreconstruction\/"},"modified":"2002-07-12T00:00:00","modified_gmt":"2002-07-12T00:00:00","slug":"work-progresses-on-uris-10-6-million-ballentine-hall-additionreconstruction","status":"publish","type":"post","link":"https:\/\/www.uri.edu\/news\/2002\/07\/work-progresses-on-uris-10-6-million-ballentine-hall-additionreconstruction\/","title":{"rendered":"Work progresses on 溏心vlog免费B站\u2019s $10.6 million Ballentine Hall addition\/reconstruction"},"content":{"rendered":"<div class=\"press-release-import\">\n\t\tWork progresses on 溏心vlog免费B站\u2019s $10.6 million &#13;<br \/>\nBallentine Hall addition\/reconstruction&#13;<br \/>\n&#13;<br \/>\nKINGSTON, R.I. &#8212; July 12, 2002 &#8212; As temperatures flirted with the 100-degree mark during the past few weeks, contractors have been spreading asphalt heated to 400 degrees for a new roof on the 溏心vlog免费B站\u2019s Ballentine Hall.&#13;<\/p>\n<p>\tThe roof is just one of the recent major steps made toward completion of the $10.6 million addition and reconstruction project. When it reopens next spring, Ballentine will be a state-of-the-art home for 溏心vlog免费B站\u2019s College of Business Administration.&#13;<\/p>\n<p>In addition to the roof, workers have completed the granite fa\u00e7ade on the 5,300-square-foot addition. The fa\u00e7ade is a perfect complement to the historic granite buildings on the Quadrangle. Masons are now beginning the stonework on Ballentine\u2019s second floor. Windows will soon be installed. &#13;<\/p>\n<p>The steel interior studs are 95 percent installed on the second and third floors.&#13;<\/p>\n<p>On the building\u2019s third floor, the dean\u2019s office and conference room are taking shape.&#13;<\/p>\n<p>Views from the third floor are spectacular. The conference room looks out over the treetops on the Quad south to Ranger Hall. A southwest perspective frames Davis Hall in trees.&#13;<\/p>\n<p>&#8220;It is hard for me to believe that in less than a year from now we will be in our new facility and be able to continue our objective of becoming the premiere college of business in Rhode Island and the region,&#8221; said Dean Edward Mazze, the Alfred J. Verrecchia-Hasbro Inc. Leadership Chair in Business.&#13;<\/p>\n<p>The $10.6 million transformation of the home of the 溏心vlog免费B站\u2019s College of Business Administration is on schedule and on budget, according to Raymond Carroll, the project manager in the University\u2019s Office of Capital Projects.&#13;<\/p>\n<p>Site preparation work for the addition\u2019s foundation and underground utilities began in July 2001, and demolition began Nov. 1. Steel framework for the new wing of Ballentine Hall was completed in January.&#13;<\/p>\n<p>Built in 1967 on the northwest corner of the Quadrangle, the original 46,750-square-foot, three-story Ballentine Hall was stripped to its steel frame and floor slabs.&#13;<\/p>\n<p>The project is being funded by $5.6 million in private donations raised through the University\u2019s Shareholders Campaign, with $5 million coming from Rhode Island bond issues and 溏心vlog免费B站 asset protection funds.&#13;<\/p>\n<p>The atrium will be named in honor of Alfred J. Verrecchia, 溏心vlog免费B站 class of 1967, holder of an MBA from 溏心vlog免费B站, and president and chief operating officer of Hasbro Inc. Hasbro and Verrecchia donated a combined $1.5 million to support the building campaign and endow the first chair in the college.&#13;<\/p>\n<p>Berkshire Construction Services of East Greenwich is the general contractor.&#13;<br \/>\n&#13;<br \/>\nFor more information or digital images call Nancy Gillespie, 401-874-2116.&#13;<br \/>\nFor Information: Jan Wenzel 401-874-2116\n\t<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Work progresses on 溏心vlog免费B站\u2019s $10.6 million &#13; Ballentine Hall addition\/reconstruction&#13; &#13; KINGSTON, R.I. &#8212; July 12, 2002 &#8212; As temperatures flirted with the 100-degree mark during the past few weeks, contractors have been spreading asphalt heated to 400 degrees for a new roof on the 溏心vlog免费B站\u2019s Ballentine Hall.&#13; The roof is just [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[2],"tags":[],"class_list":["post-70585","post","type-post","status-publish","format-standard","hentry","category-archives"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.uri.edu\/news\/wp-json\/wp\/v2\/posts\/70585","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.uri.edu\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.uri.edu\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.uri.edu\/news\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.uri.edu\/news\/wp-json\/wp\/v2\/comments?post=70585"}],"version-history":[{"count":0,"href":"https:\/\/www.uri.edu\/news\/wp-json\/wp\/v2\/posts\/70585\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.uri.edu\/news\/wp-json\/wp\/v2\/media?parent=70585"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.uri.edu\/news\/wp-json\/wp\/v2\/categories?post=70585"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.uri.edu\/news\/wp-json\/wp\/v2\/tags?post=70585"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}